Update from Carl Couch, VP of Admin. Svcs., 8/25/15

Library and Xeriscape projects: We continue to work with our new General Contractor on these projects. While skilled and on task, progress is slower than we’d like. As we address the known defective work, we are uncovering additional deficiencies that require further … Continue reading

Posted in Uncategorized | Comments Off on Update from Carl Couch, VP of Admin. Svcs., 8/25/15

Library Project Update – a letter from Dr. Jan Gehler, President, Scottsdale Community College

Dear SCC Faculty, Staff and Students, As you know, our Library has been undergoing an extensive renovation over the last few years. What began as a one-year project has stretched into additional years for a variety of reasons that have … Continue reading

Posted in Uncategorized | Comments Off on Library Project Update – a letter from Dr. Jan Gehler, President, Scottsdale Community College

Progress report for 12/15/14

Highlights from DLR Group’s Field Observation Report 65: At the book detector, the Moxie panels have been removed and the frames have been repainted At the acoustical accent walls; – the installation and painting of the steel trim has been … Continue reading

Posted in Uncategorized | Comments Off on Progress report for 12/15/14

Progress report for 12/3/2014

Highlights from DLR Group’s Field Observation Report 64: The pipe bollards around the patio have been painted The Moxie panels have been installed to the frames at the book detector Work to install and paint the steel trim on the … Continue reading

Posted in Uncategorized | Comments Off on Progress report for 12/3/2014

Progress report for 11/12/14

Highlights from DLR Group’s Field Observation Report 61: Except for the axiom trim along the edges, the ceiling has been installed The solid surface tops are installed to the circulation desk Work on the ceramic tile in restroom #406 is … Continue reading

Posted in Uncategorized | Comments Off on Progress report for 11/12/14

Progress report for 10/29/14

Highlights from DLR Group’s Field Observation Report 59: Work to complete the installation of the metal ceiling over the entry area is continuing Installation of the Axiom trim around the Tectum ceiling has begun The drywall sub is performing some … Continue reading

Posted in Uncategorized | Comments Off on Progress report for 10/29/14

Progress report for 10/22/14

Highlights from DLR Group’s Field Observation Report 58: Work on the ceiling will continue after the installation of the Terrazzo flooring has been completed Installation of the Axiom trim around the Tectum ceiling has begun The drywall sub is performing … Continue reading

Posted in Uncategorized | Comments Off on Progress report for 10/22/14

October 21, 2014, photo update (click a photo to enlarge it)

     

Posted in Uncategorized | Comments Off on October 21, 2014, photo update (click a photo to enlarge it)

Progress report for 10/15/14

Highlights from DLR Group’s Field Observation Report 57: Work to complete the installation of the metal ceiling over the entry area is pending the resolution of how to attach the light fixtures to the grid Work to install the forms for … Continue reading

Posted in Uncategorized | Comments Off on Progress report for 10/15/14

Progress report for 10/8/14vvvv

Highlights from DLR Group’s Field Observation Report 56: Work to complete the installation of the metal ceiling over the entry area is pending the resolution of how to attach the light fixtures to the grid The repairs to the track for … Continue reading

Posted in Uncategorized | Comments Off on Progress report for 10/8/14vvvv