Progress report for 11/12/14

Highlights from DLR Group’s Field Observation Report 61: Except for the axiom trim along the edges, the ceiling has been installed The solid surface tops are installed to the circulation desk Work on the ceramic tile in restroom #406 is … Continue reading

Posted in Uncategorized | Comments Off on Progress report for 11/12/14

Progress report for 10/29/14

Highlights from DLR Group’s Field Observation Report 59: Work to complete the installation of the metal ceiling over the entry area is continuing Installation of the Axiom trim around the Tectum ceiling has begun The drywall sub is performing some … Continue reading