Monthly Archives: September 2014

Progress report for 8/6/14

Highlights from DLR Group’s Field Observation Report 48: The exterior tilt panels for the lower portion of the building and the air intake louvers have been painted The equipment has been installed in the IDF room and work on the … Continue reading

Posted in Uncategorized | Comments Off on Progress report for 8/6/14

Report for 9/10/14

Highlights from DLR Group’s Field Observation Report 53: Installation of the millwork in the break room and tech services areas has been done – countertops have been installed The ceramic tile installation to the walls tile in the public restrooms, … Continue reading

Posted in Uncategorized | Comments Off on Report for 9/10/14

Progress report for 9/3/14

Highlights from DLR Group’s Field Observation Report 52: Work to install the spandrel glass in the exterior aluminum frames has been done for the two locations on the east wall of the tech services area Installation of the millwork in … Continue reading

Posted in Uncategorized | Comments Off on Progress report for 9/3/14

Progress report for 8/21/14

Highlights from DLR Group’s Field Observation Report 51: Work to install the spandrel glass in the exterior aluminum frames has been done except for two locations on the east wall of the tech services area The electrical contractor has installed … Continue reading

Posted in Uncategorized | Comments Off on Progress report for 8/21/14