Progress report for 8/20/14

Highlights from DLR Group’s Field Observation Report 50:

  • The equipment has been installed in the IDF room and work on the cable terminations is in progress
  • Work to install the spandrel glass in the exterior aluminum frames is in progress
  • The electrical subcontractor has installed the track lighting over the circulation area
  • Work to install the light fixtures in the south mechanical room is in progress
  • Installation of the millwork in the break room and tech services areas has been done – countertops have been installed
  • Installation of the outside air intake duct in both mechanical rooms is in progress
  • The electrical contractor is working to address items identified in the field reports from Bridgers and Paxton
  • The ceramic tile installation to the walls tile in the public restrooms has been done with work to install the glass accent tile in progress
  • The glass tile accent band has been installed in the men’s RR with work on the women’s to follow
  • The chain curtains are in place

Here’s an interesting fact that’s not in today’s report: there are 32 miles of computer cabling in the library!

Exterior wall and fascia panels

Exterior wall and fascia panels

Network cabling in the IDF room

Network cabling in the IDF room

Glass accent tile in restroom

Glass accent tile in restroom

Spandrel glazing in place

Spandrel glazing in place

Cabinetry in the Tech Services area

Cabinetry in the Tech Services area

Work on the seat wall bench covers

Work on the seat wall bench covers

Exterior soffit has been painted

Exterior soffit has been painted