Progress report for 7/30/14

Highlights from DLR Group’s Field Observation Report 48:

  • Work on the gypsum drywall is continuing with activities in progress to coat the let-in vertical light fixtures in the wall niches
  • Installation of the air intake and supply air duct to the AHU is in progress in the north mechanical room is in progress
  • The air handler from the south mechanical room has been started and the space is being acclimated
  • The electrical contractor has installed the recessed can light fixtures over the stacks area – the layout for the track lighting has been done
  • Work to install the acoustical ceiling grid installation is ongoing in some of the office areas
  • The ceramic tile installation has resumed with work on the walls tile
  • Work to install the glazing in the storefront window systems has progressed with most of the clear glass in place and the spandrel glass waiting to be installed
  • Installation of the lighting on the stack shelving has been completed and is energized
  • The angles for the chain curtain are in place
  • The entrance canopy, roof extension piece has been installed
Extension for entrance canopy has been installed

Extension for entrance canopy has been installed

Installation of the chain curtain track

Installation of the chain curtain track

Light fixtures over the cordial reading area

Light fixtures over the cordial reading area

Mock-up section of the circulation desk

Mock-up section of the circulation desk