Progress report for 5/28/14

Highlights from DLR Group’s Field Observation Report 40: Work on the gypsum drywall has resumed with activities in progress to hang gypsum board and tape and coat the walls/ceilings in the classrooms, study rooms and the perimeter soffits The electrical … Continue reading

Posted in Uncategorized | Comments Off on Progress report for 5/28/14

Progress report for 5/21/14

Highlights from DLR Group’s Field Observation Report 39: The flexible duct tie-ins to the linear diffusers around the perimeter of the circulation area have been done Welding on the chilled water lines in the south mechanical room – extending the … Continue reading

Posted in Uncategorized | Comments Off on Progress report for 5/21/14

Progress report for 3/18/14

Highlights from DLR Group’s Field Observation Report 29: Metal framing is being installed for the acoustical wall assembly on the East and West ends of the classrooms. Some of the niches were framed in as well. Exterior metal framing for the … Continue reading

Posted in Uncategorized | Comments Off on Progress report for 3/18/14

Progress report for 5/7/14

Highlights from DLR Group’s Field Observation Report 37: Work on the roof includes – application of the mesh tape and coating to the seams of the metal roof panels and on the upper roof area above the clerestory windows Work … Continue reading

Posted in Uncategorized | Comments Off on Progress report for 5/7/14

Progress report for 4/30/14

Highlights from DLR Group’s Field Observation Report 36: Work on the roof includes – application of the mesh tape and coating to the seams of the metal roof panels and on the upper roof area above the clerestory windows Work … Continue reading