Progress report for 2/10/14

Highlights from DLR Group’s Field Observation Report 24: Flat-panel wall boxes have been installed in the main entry. The backing for the future wall mounted LCD TV’s will need to be solid wood fire treated blocking or an alternate blocking product … Continue reading

Posted in Uncategorized | Comments Off on Progress report for 2/10/14

Behind the construction fence: a photo update

Posted in Uncategorized | Comments Off on Behind the construction fence: a photo update

Progress report for 2/5/14

Highlights from DLR Group’s Field Observation Report 23: Terrazzo sample was submitted by Stone Finish. There are various types of insulation being installed within the library interior partitions. Threaded rods located along the West edge of the unistrut ceiling appear … Continue reading