Progress report for 11/25/13

Highlights from DLR Group’s Field Observation Report 13: Trenching for the new domestic water line was complete and contractor was in the process of installing new domestic water piping. Concrete had been poured on the North and South sides of … Continue reading

Posted in Uncategorized | Comments Off on Progress report for 11/25/13

Progress report for 11/19/13

Highlights from DLR Group’s Field Observation Report 12: Excavation for grade beams along the East façade of the building were complete. Removal of the remaining concrete slab in the main library space was underway. Finish grade was established within the … Continue reading

Posted in Uncategorized | Comments Off on Progress report for 11/19/13

Progress report for 11/8/13

Highlights from DLR Group’s Field Observation Report 11: Floorboxes and conduit for power and data were installed on the south end of the building. The electrical contractor indicated that the existing concrete slabs and existing waste slabs still remaining in the … Continue reading

Posted in Uncategorized | Comments Off on Progress report for 11/8/13

Progress report for 11/6/13

Highlights from DLR Group’s Field Observation Report 10: The center of the library has been graded. Metal framing was underway on the east side of the library. a  

Posted in Uncategorized | Comments Off on Progress report for 11/6/13

Progress report for 10/30/13

Highlights from DLR Group’s Field Observation Report 9: Additional site demolition of East concrete walks was underway. The pre-cast concrete panels on the South elevation of the building have been removed. One panel has been relocated to infill an existing opening … Continue reading

Posted in Uncategorized | Comments Off on Progress report for 10/30/13